Stone either settles or it does not, and that is decided entirely below what you can see. Our base preparation is deeper than code requires because Central Florida sand does not forgive a thin one. The visible craft matters — but it is the twelve inches underneath that determine whether a terrace still sits flat in fifteen years.
$12,000
Hardscape projects generally begin at $12,000 installed.
What the work includes
- Excavation and compacted base built for our soils
- Natural stone, clay paver, and travertine installation
- Segmental and mortared retaining walls with proper drainage
- Steps, terraces, seat walls, and fire features
- Landscape lighting integrated during construction
- Permitting and engineering coordination where required
What moves the number
- Material selection
- Travertine, bluestone, and clay pavers span a wide range per square foot. The labor is similar; the material is where the budget moves.
- Elevation change
- Flat installations are straightforward. Anything that steps or retains adds engineering, drainage, and structural base — which is where cost accumulates.
- Site access
- Stone is heavy. If machines can reach the work, the project is faster and cheaper. If it moves by wheelbarrow through a side gate, that is real labor and we say so up front.
Asked on this work
How long before I can use a new terrace?
Dry-laid stone is usable immediately. Mortared work and anything with a fire feature needs a cure period, typically three to seven days depending on the assembly.
Will pavers shift over time?
Not if the base is right. Nearly every settled patio we are called to repair failed underneath, not on the surface. That is why our base spec is heavier than the minimum.